The Lift Plan should be valid for more than one day, as long as the composition, locale, and parameters utilized for developing “worst case” condition have not altered.gross chart capacity) for each particular crane composition and location and activity (e.g., unload a delivery vehicle is contrary to the erecting steel activity). Crane Lift Plans (CLP) must be established on worst case % of capacity (for example.